Journal article

Design of a Throttled Surge Tank for Refurbishment by Increase of Installed Capacity at a High-Head Power Plant

  • Adam, N. J. Ph.D. Student, Laboratoire des Constructions Hydrauliques, Ecole Polytechnique Fédérale de Lausanne, Station 18, 1015 Lausanne, Switzerland (corresponding author).
  • De Cesare, G. Senior Researcher, Laboratoire des Constructions Hydrauliques, Ecole Polytechnique Fédérale de Lausanne, Station 18, 1015 Lausanne, Switzerland.
  • Nicolet, C. Managing Director, Power Vision Engineering Sàrl, Chemin des Champs Courbes 1, 1024 Ecublens, Switzerland.
  • Billeter, P. Managing Director, IUB Engineering AG, Belpstrasse 48, 3000 Bern, Switzerland.
  • Angermayr, A. Project Engineer, IM Maggia Engineering AG, via Stefano Franscini 5, casella postale 46, 6601 Locarno, Switzerland.
  • Valluy, B. Project Manager, Alpiq Holding SA, Chemin de Mornex 10, 1003 Lausanne, Switzerland.
  • Schleiss, A. J. Professor, Laboratoire des Constructions Hydrauliques, Ecole Polytechnique Fédérale de Lausanne, Station 18, 1015 Lausanne, Switzerland.
Show more…
Published in:
  • Journal of Hydraulic Engineering. - American Society of Civil Engineers (ASCE). - 2018, vol. 144, no. 2, p. 05017004
Language
  • English
Open access status
green
Identifiers
Persistent URL
https://susi.usi.ch/global/documents/92937
Statistics

Document views: 29 File downloads:
  • Full-text: 0