Design of a Throttled Surge Tank for Refurbishment by Increase of Installed Capacity at a High-Head Power Plant
-
Adam, N. J.
Ph.D. Student, Laboratoire des Constructions Hydrauliques, Ecole Polytechnique Fédérale de Lausanne, Station 18, 1015 Lausanne, Switzerland (corresponding author).
-
De Cesare, G.
Senior Researcher, Laboratoire des Constructions Hydrauliques, Ecole Polytechnique Fédérale de Lausanne, Station 18, 1015 Lausanne, Switzerland.
-
Nicolet, C.
Managing Director, Power Vision Engineering Sàrl, Chemin des Champs Courbes 1, 1024 Ecublens, Switzerland.
-
Billeter, P.
Managing Director, IUB Engineering AG, Belpstrasse 48, 3000 Bern, Switzerland.
-
Angermayr, A.
Project Engineer, IM Maggia Engineering AG, via Stefano Franscini 5, casella postale 46, 6601 Locarno, Switzerland.
-
Valluy, B.
Project Manager, Alpiq Holding SA, Chemin de Mornex 10, 1003 Lausanne, Switzerland.
-
Schleiss, A. J.
Professor, Laboratoire des Constructions Hydrauliques, Ecole Polytechnique Fédérale de Lausanne, Station 18, 1015 Lausanne, Switzerland.
Show more…
Published in:
- Journal of Hydraulic Engineering. - American Society of Civil Engineers (ASCE). - 2018, vol. 144, no. 2, p. 05017004
-